Construction Delays Friday - Sunday Traffic on I-90 - NBC Right Now/KNDO/KNDU Tri-Cities, Yakima, WA |

Construction Delays Friday - Sunday Traffic on I-90

Posted: Updated:

EASTON, Wash. - For the next six weekends, drivers traveling on Interstate 90 near Easton should expect delays. 

The Washington State Department of Transportation says a 3 mile stretch of the roadway will have lane restrictions in place, between mileposts 70 and 73.

Crews are repairing the bridge deck on the westbound Yakima River Bridge, and need to close one lane to remove and replace concrete.

The DOT says from 11 AM to 8 PM, drivers traveling westbound should prepare for two hour delays on Fridays, and one hour delays on Saturdays.

On Sundays, the DOT says drivers traveling eastbound and westbound should plan for at least two hour delays between 8 a.m. and 8 p.m.

During the week, the Department of Transportation says drivers will also experience minor delays and lane restrictions.

HD DOPPLER 6i
/
  • Tri-CitiesTri-Cities NewsMore>>

  • Secretary of Defense James Mattis visits Chief Joseph Middle School

    Secretary of Defense James Mattis visits Chief Joseph Middle School

    Friday, November 16 2018 7:11 PM EST2018-11-17 00:11:14 GMT

    Students at Chief Joseph Middle School had a surprise on Friday, November 16 when James Mattis, the U.S. Secretary of Defense, paid a visit.  

    More >>

    Students at Chief Joseph Middle School had a surprise on Friday, November 16 when James Mattis, the U.S. Secretary of Defense, paid a visit.  

    More >>
  • Newhouse bill honoring fallen Richland Marine heads to President’s desk

    Newhouse bill honoring fallen Richland Marine heads to President’s desk

    Friday, November 16 2018 5:23 PM EST2018-11-16 22:23:06 GMT

    Rep. Dan Newhouse (R-WA), Senator Maria Cantwell (D-WA), and Senator Patty Murray (D-WA) released the following statements after the U.S. Senate approved H.R. 5504, to designate the U.S. Postal Service facility at 4801 West Van Giesen Street in West Richland, Washington as the “Sergeant Dietrich Schmieman Post Office.” Rep. Newhouse introduced H.R. 5504 with the support of the entire Washington delegation to honor the life and service of U.S. Marin

    More >>

    Rep. Dan Newhouse (R-WA), Senator Maria Cantwell (D-WA), and Senator Patty Murray (D-WA) released the following statements after the U.S. Senate approved H.R. 5504, to designate the U.S. Postal Service facility at 4801 West Van Giesen Street in West Richland, Washington as the “Sergeant Dietrich Schmieman Post Office.” Rep. Newhouse introduced H.R. 5504 with the support of the entire Washington delegation to honor the life and service of U.S. Marin

    More >>
  • NRA sues to block new Washington gun control measure

    NRA sues to block new Washington gun control measure

    Thursday, November 15 2018 10:47 PM EST2018-11-16 03:47:16 GMT

    The National Rifle Association is suing to block a new, voter-approved gun control measure in Washington state. 

    More >>

    The National Rifle Association is suing to block a new, voter-approved gun control measure in Washington state. 

    More >>