DOT Has Fix for Naches River Bridge - NBC Right Now/KNDO/KNDU Tri-Cities, Yakima, WA |

DOT Has Fix for Naches River Bridge

YAKIMA, wa -  The Department of Transportation says it will use a heat-straightening system to fix the Naches River Bridge.

DOT engineers say this is the quicker, cheaper solution, But it will still force them to shut down a section of I-82 for ten days next year.

The bridge was damaged last summer when a semi-truck carrying a crane damaged a horizontal support beam.

HD DOPPLER 6i
/